Event Log for 2018-04-04

  1. 14:05 GT13 started by SGC; FSNL @ 14:16.
  2. 14:24 GT13 synchronized by GCB, load set-point 5 MW; stepwise load increase.
  3. 14:39 GT at base load (100% load) >  start of C-991.
  4.  15:21 HCO activated.
  5. 15:45 GT at 120 MW (75% load).
  6. 16:52 GT at 75 MW (50% load) >  start of C-938.
  7.  17:52 C-991 & C-938 testing completed.
  8. 17:59 Load reduction to 5 MW.
  9. 18:07 De-synchronized (GCB opened).
  10. 18:09 GT13 shut-down.