Event Log for 2018-03-31

GT11

  1. 00:00 GT11 @ base load.
  2. 03:05 Load reduced to 120 MW.
  3. 11:06 Load reduced to 100 MW.
  4. 16:52 GT11 at base load.
  5. 00:01 Load reduction initiated.
  6. 00:27 GT11 de-synchronized (GCB opened).

GT13

  1. 09:24 GT13 started by SGC; FSNL @ 09:36 & 45 mins FSNL operation.
  2. 10:21 GT13 synchronized by GCB, load set-point 5 MW; stepwise load increase.
  3. 10:55 Load @ 80 MW.
  4. 11:16 Load @ 120 MW.
  5. 11:29 GT13 at base load (153 MW).
  6. 14:44 HCO activated.
  7. 00:01 Load reduction initiated.
  8. 00:27 GT13 de-synchronized (GCB opened).