Event Log for 2018-04-10

  1. 10:36 GT12 started by SGC.
  2. 10:49 GT synchronized by GCB & stepwise load increase.
  3. 11:18 GT @ 120 MW (AVR tests).
  4. 13:39 GT@ base load.
  5. 14:58 GT load rejection to FSNL (GCB opened), C-103.
  6.  15:01 GT re-synchronized by GCB and load increase to 80 MW.
  7. 15:14 GT @ base load.
  8. 15:21 Gradual load reduction.
  9. 15:35 GT de-synchronized (GCB opened) & GT shut-down.