Event Log for 2018-04-07

GT12

  1. 11:11 GT12 started by SGC; FSNL @ 11:18.
  2. 11:23 GT synchronized by GCB, stepwise load increase.
  3. 13:48 GT @ base load (147 MW).
  4. 14:56 Gradual load reductions due to GT13 start.
  5. 15:17 GT @ 60 MW load.
  6. 16:52 GT @ base load (to compensate GT13 shut-down).
  7. 17:45 GT @ 120 MW.
  8. 18:30 GT @ base load.
  9. 18:46 GT @ 80 MW and shut-down command.
  10. 18:54 GT de-synchronized and shut-down.

GT13

  1. 14:40 GT13 started by SGC; FSNL @ 14:49.
  2. 14:50 GT synchronized by GCB.
  3. 15:17 GT @ base load.
  4. 16:41 Load rejection from base load to FSNL (GCB opened), C-103.
  5. 16:43 GT re-synchronized by GCB and load increase to 40 MW.
  6. 16:48 GT shutdown initiated, GT shut-down @ 16:51.
  7. 17:18 GT re-start > Automatic start-up of GT (hot start), C-916.
  8. 18:10 Load rejection from base load to house load (UCB opened), C-103.
  9. 18:13 GT re-synchronized by UCB and load increase to 40 MW.
  10. 18:27 GT shut-down command.
  11. 18:31 GT de-synchronized and shut-down.